Dubai Marina · Dubai

Rove Home Dubai Marina

Apartment by Irth Development in Dubai Marina, Dubai.

  • Branded residences
  • Apartment
Starting price AED 1.35M about USD 368K Get prices and floor plans
Starting price
AED 1,350,000
In US dollars
about USD 367,597
Bedrooms
Studio to 2 beds
Sizes
402 to 1,511 sq ft
Payment plan
10 / 40 / 50
Handover
Dec 2027
Ownership
Not yet published
Property types
Apartment
Developer
Irth Development
Registration
4% of the price

Payment plan

10%On booking40%During construction50%On handover
On booking (10%)AED 135,000
During construction (40%)AED 540,000
On handover (50%)AED 675,000

Based on the starting price. Registration (4%) is usually paid at booking on top of the plan.

About Rove Home Dubai Marina

Discover a revolutionary living experience with Rove Home Dubai Marina by IRTH Development, a bold collaboration with Rove Hotels that redefines branded studios, 1 & 2 bedroom apartments and sky lofts. Positioned at the heart of the dynamic Dubai Marina, this development is tailor-made for active professionals and savvy investors who value wellness, connectivity, and exceptional design. Combining the brand renowned hospitality ethos with thoughtfully designed living spaces, this leisure class façade delivers an unmatched lifestyle in a market traditionally focused on ultra-luxury properties. With seamless access to the Marina promenade, Dubai Marina Mall, and public transport, this residence offers an unparalleled blend of style, convenience, and value with the essence of modern living. Strategically positioned in Dubai Marina, the development ensures seamless connectivity to key city hubs, including Dubai Marina Mall, the Marina Promenade, and public transport networks. With a total of 679 units, the tower’s configuration maximizes functionality and aesthetic appeal. From ground-level podium amenities to residential floors and Sky lofts perched on the upper levels, the development blends form and function effortlessly. Elevators designed for efficiency, including six residential lifts and one service lift, ensure smooth transitions within the building’s vertical expanse. The architectural excellence redefines the concept of space with its innovative, fully furnished residences that are meticulously designed to optimize both comfort and functionality. Compact yet thoughtfully crafted, the studio apartments are perfect sanctuaries for relaxation and productivity. Featuring smart designs like Flexibeds, which seamlessly transform spaces, these residences embody efficiency without compromising on style. One-bedroom units elevate smart living to new heights with disappearing pocket walls and adaptable layouts. Whereas the sky lofts offer an unparalleled living experience with double-height ceilings, stunning views of the Marina’s waterfront, and the city skyline.

Questions investors ask

Who is the developer of Rove Home Dubai Marina?

Rove Home Dubai Marina is developed by Irth Development in collaboration with Rove Hotels.

Where is Rove Home Dubai Marina located?

The development is located in Dubai Marina, Dubai, offering connectivity to the Marina Promenade, Dubai Marina Mall, and public transport networks.

What property types are available in Rove Home Dubai Marina?

The project features 679 fully furnished residences consisting of studios, 1 and 2-bedroom apartments, and sky lofts.

When is the scheduled handover for Rove Home Dubai Marina?

The handover for the development is scheduled for December 2027.

What amenities are provided at Rove Home Dubai Marina?

Residents have access to a gym, shared pool, children's pool, children's play area, covered parking, and 24/7 security.

Location

Dubai Marina, Dubai. Open in Google Maps

Similar projects in Dubai

Dubai Marina · Dubai

Pelagos by IGO

Invest Group Overseas

from AED 1.2M

  • 2 bed
  • Plan 20/30/50
  • Handover 2026

Dubai Marina · Dubai

Aeternitas

London Gate

from AED 1.6M

  • 5 bed
  • Plan 10/30/60
  • Handover 2027

Dubai Marina · Dubai

LIV LUX

Nuri Living

from AED 1.85M

  • 5 bed
  • Plan 10/50/40
  • Handover 2026